Stakeholder Consultation Meeting of the Technical Assistance Project on Preparation of River Basin Management Plans for Six Basins, co-financed by the European Union and Türkiye within the scope of the IPA-2 period of the European Union Instrument for Pre-Accession Assistance, was held on 14 February 2022 at Crowne Plaza Antalya Hotel at 09.30-12.30. The meeting started with the opening speech of the Project Director Mr. Ünal SAYMAN and continued with the speech of the Director General for Water Management, Ministry of Agriculture and Forestry Mr. Bilal DİKMEN.
The Project Team Leader Dr. Jaroslav SLOBODNIK delivered the technical presentation of the project. Following his presentation, Mr. SLOBODNIK answered the questions of the participants. The technical presentation on the Antalya Basin was delivered by Mr. Bora TURAN, Antalya Basin Responsible Person. Following his presentation, Mr. TURAN answered the questions of the participants. The meeting was completed with the contributions of more than 100 participants, consisting of the representatives of central institutions working on water management, local institutions within the basin and the technical assistance team.
The project has started in September 2021 and is planned to be completed in March 2025. The budget of the project is 6,915,000 Euro. The Contracting Authority of the project is the Department of EU Financial Assistance, under the General Directorate of European Union and Foreign Affairs, Ministry of Environment and Urbanization. The End Recipient of the project is the Directorate General for Water Management, under the Ministry of Agriculture and Forestry.
The consortium consisting of DAI, NFB Mühendislik ve Müşavirlik, Finnish Environmental Institute SYKE, and ACC Danışmanlık carry out the project.
The project aims to achieve good water status in all water bodies in six basins through the implementation of EU WFD (2000/60/EC) and related daughter directives, and to distribute the water needed by the relevant sectors in an equitable, efficient, and planned manner.
Following are the main outputs to be achieved based on the overall objective and purpose of the project:
Within the scope of the project, Characterisation Reports, Significant Water Management Issues Reports, Monitoring Reports, Environmental Objectives Reports and the Programmes of Measures, which are significant components of River Basin Management Plans, as well as Sectoral Water Allocation Plans and Strategic Environmental Assessment Reports will be prepared for six basins. As seen in the table below, project activities will cover a significant portion of the surface area, population and water potential of Türkiye.
BASIN | Surface Area (km2) | Water Potential (hm3) | Population (Person) |
Antalya | 20.331 | 12.944 | 2.694.889 |
Batı Karadeniz | 28.922 | 10.797 | 1.923.238 |
Doğu Akdeniz | 21.807 | 7.559 | 1.769.938 |
Doğu Karadeniz | 22.844 | 16.426 | 2.465.878 |
Kızılırmak | 82.109 | 7.004 | 4.474.093 |
Marmara | 23.085 | 7.442* | 18.880.220 |
TOTAL | 199.098 | 62.172 | 32.208.256 |
IN TOTAL | %25,54 | %33,54 | %38,71 |
*The value is provided only for the Asian Side.